B2V2

General Abstract B2V2:

Status of works taken up under B2V2  Programme RDD Kulgam          (Rs in lakhs)
S No Name of the Sector No of works authorized under B2B2 No of works completed Under progress Total Funds released under B2V-2 Expenditure under B2V-II ending 02/2021
Ongoing New Total 
1 RDD 14 52 66 53 13 66 166.31 40.337
2 PHE 7 0 7 6 1 7 11.16 5.524
3 Irrigation 0 5 5 3 2 5 18.80 7.450
4 Flood Control 0 2 2 1 1 2 29.00 17.027
5 PDD 0 5 5 0 5 5 24.73 0.000
Total 21 64 85 63 22 85 250.00 70.338
  1. Rural Development Department:
Physical and Financial Progress Report under B2V-II                   (Rs in lakhs)
S No Block Panchayat Halqa Type Name of the work Authorised cost Rs in Lacs Cummu Expdtt ending 03/2020  funds released  under B2V2  2020-21 Expdt. Under B2V2 (ending 02/2021) Physical Status
BTV2 14th FC MGNREGA Total
1 Pombay Gopalpora ongoing C/o. road from Graveyard to HO Tayoub Shah via Parry Mohalla Gopalpora 2.300 2.29 0.66 5.250 0.00 2.3000 2.3000 Completed
2 Pombay Mirhama ongoing C/o. Mirhama to Laisoo road. 2.875 2.88 1.60 7.350 0.00 2.8750 2.8750 Completed
3 Pombay Nillow New C/o. different lanes and roads at Panchayat Halqa Nillow 6.000 0.00 1.50 7.500 0.00 6.0000 0.0000 Phy. Completed
Total Pombay 11.18 5.17 3.76 20.10 0.00 11.18 5.1750  
1 Kund Kanchloo New Const. of  road  connectivity in interior of GP Panchayat Halqa Kancloo Block Bund 6.000 0.00 1.50 7.500 0.000 6.0000 0.0000 Under Progress
Total Kund 6.00 0.00 1.50 7.50 0.00 6.00 0.00  
1 Kulgam Awhatoo ongoing Construction / up-gradation of internal roads at Awhatoo 0.870 0.870 2.200 3.940 0.000 0.8700 0.8700 Completed
2 Kulgam Checkpora New Restoration of Irrigation Channel at Checkpora   1.600 0.000 0.400 2.000 0.000 1.6000 1.6000 Phy Completed
3 Kulgam Okey New C/o. Filling, fencing and drainage system for play ground at Okey 4.000 0.000 1.000 5.000 0.000 4.0000 0.0000 Under Progress
4 Kulgam Amanoo New C/o. Road from Amanoo to Shurat . 2.400 0.000 0.600 3.000 0.000 2.4000 2.4000 Phy Completed
5 Kulgam Nanibugh New C/o. Link road from Nanibugh to Primary School Towards Poniwah. (Rural Connectivity) 2.400 0.000 0.600 3.000 0.000 2.4000 2.4000 Phy Completed
6 Kulgam Shurath New C/o Link road from Jamia Masjid Dadipora to H/O Ab Salam Rather 4.000 0.000 1.000 5.000 0.000 4.0000 0.0000 Phy Completed
7 Kulgam Bougam A New C/o Bund over Kralnard near Nazir Ahmad Mir Kumar Mohalla  2.000 0.000 0.500 2.500 0.000 2.0000 0.0000 Phy Completed
8 Kulgam Ashthal New C/o. Flood Protection bund Nindeth to Veshu North South for Ashthal 4.000 0.000 1.000 5.000 0.000 4.0000 0.0000 Phy Completed
9 Kulgam Awgam New C/o. Road at Bundal Awgam 2.800 0.000 0.700 3.500 0.000 2.8000 0.0000 Phy Completed
10 Kulgam Bugam B New C/o. drainage system at PHC 2.400 0.000 0.600 3.000 0.000 2.4000 0.0000 Phy Completed
11 Kulgam Katrasoo New C/o. foot road upto the spot Razakun at Katrasoo 2.240 0.000 0.560 2.800 0.000 2.2400 0.0000 Phy Completed
12 Kulgam Chansar New C/o. Lane / Street at New Mohalla Kandri from main road to Mubarik Ahmad Rather 1.600 0.000 0.400 2.000 0.000 1.6000 0.0000 Phy Completed
13 Kulgam Sangus  New C/o road Lamman to Batsargam via Kharote Sangus 1.200 0.00 0.80 2.000 0.000 1.2000 1.1200 Phy Completed
14 Kulgam Tazipora  New C/o FP Bund around the Nalla Grumath 1.450 0.00 0.85 2.300 0.000 1.4500 0.0000 Phy Completed
Total Kulgam 32.96 0.87 11.21 45.04 0.00 32.96 8.39  
1 D.H Pora Nandimarg-A ongoing C/o road / lane  at Nandimarg. 1.605 1.605 0.910 4.120 0.000 1.6050 1.605 Completed
2 D.H Pora Ahamadabad A ongoing C/o. road from Beigh Mohalla to Ziyarat Sharieef Ali Shah Saheb Laispora. 1.160 1.000 0.500 2.660 0.000 1.1600 1.160 Completed
3 DH Pora Yarikhah C New Constt. of concrete Bund on Nallah Kandi from Ganie Mohalla to Kooli Mohalla at Yarikhah C  4.000 0.000 1.000 5.000 0.000 4.0000 0.0000 Phy Completed
Total DH Pora 6.77 2.61 2.41 11.78 0.00 6.77 2.765  
1 Qaimoh Danow ongoing C/o. New road from Makanpora to Wazirpora and Wazirpora to Shiekhpora. 2.500 2.500 2.500 7.500 0.000 2.5000 1.9100 Completed
2 Qaimoh Redwani Payeen ongoing C/o. Internal drainage system at Redwani Payeen 1.800 1.220 1.980 5.000 1.000 0.8000 0.7700 Completed
3 Qaimoh Bogund New Up-gradation of Interior  roads at Bogund. 4.000 0.000 1.000 5.000 0.000 4.0000 0.0000 Under Progress
4 Qaimoh Buchroo New Renovation of Irrigation Khul main road to HO Ab Satar Bhat in Village Wazirpora 2.400 0.000 0.600 3.000 0.000 2.4000 2.4000 Phy Completed
5 Qaimoh Qaimoh New C/o. Passenger shed at main Chowk Qaimoh  2.400 0.000 0.600 3.000 0.000 2.4000 2.4000 Phy Completed
6 Qaimoh Sonigam New C/o. Tile lane from main road to Shop of Mushtaq Ahmad Itoo at Her Sonigam. 2.400 0.000 0.600 3.000 0.000 2.4000 2.4000 Phy Completed
7 Qaimoh Tarigam New Dev. of Link road from HO Nazir Ahmad Mir to Kawan 4.000 0.000 1.000 5.000 0.000 4.0000 0.0000 Phy Completed
8 Qaimoh Rehpora New C/o. link road with drain from Gull Dar to Paddy field of Muzafar Dar 2.800 0.000 0.700 3.500 0.000 2.8000 2.8000 Phy Completed
9 Qaimoh  Wanigund  New Upgradation of link road from main road to Govt Middle School at Wanigund. 3.000 0.00 1.00 4.000 0.000 3.0000 0.0000 Under Progress
10 Qaimoh  Kawaki Bazar New C/o drainage system at Kawaki Bazar  1.200 0.00 0.80 2.000 0.000 1.2000 0.0000 Under Progress
11 Qaimoh  Matalhama New Upgradation of internal roads at Mutalhama 1.200 0.00 0.80 2.000 0.000 1.2000 0.0000 Under Progress
Total Qaimoh 27.70 3.72 11.58 43.00 1.00 26.70 12.680  
1 Pahloo Shahoo Sachan ongoing C/o. Lining wall / protection wall on both sides of  Sachen Ladh from source.  1.085 1.085 1.860 4.030 0.000 1.0850 1.0850 Completed
2 Pahloo Malwan B ongoing C/o road to uncovered habitations Tangwani and Vendor and Gujjar Basti 1.750 2.000 0.650 4.400 1.143 0.6070 0.6070 Completed
3 Pahloo Lammer B New C/o. Road from Hallan Adda to Kotpath( full road connectivity)   4.000 0.000 1.000 5.000 0.000 4.0000 0.0000 Phy Completed
4 Pahloo Banimullah New C/o. Road connectivity to Gojar Basti KharporaBanimullah 2.400 0.000 0.600 3.000 0.000 2.4000 2.4000 Completed
Total Pahloo 9.24 3.09 4.11 16.43 1.14 8.09 4.09  
1 Manzgam Avil ongoing Levelling of Play Field at Govt M/S Avil P/H Avil. 2.090 0.000 1.180 3.270 0.000 2.0900 2.0900 Completed
2 Manzgam Hallan ongoing C/o. lane / steps with covered roof from Manzgam to Hallan P/H Hallan 2.500 2.000 0.960 5.460 0.000 2.5000 2.5000 Completed
3 Manzgam KB Pora A ongoing C/o. road from main road to Singora via Nowbugh P/H KB Pora A. 2.500 2.000 3.880 8.380 0.000 2.5000 0.0000 Completed
4 Manzgam Chowgalpora New C/o. drain  at Chowgalpora 1.600 0.000 0.400 2.000 0.000 1.6000 0.0000 Under Progress
5 Manzgam Wattoo A New C/o. road from Panchayat to Hergam. 4.000 0.000 1.000 5.000 0.000 4.0000 0.0000 Phy Completed
6 Manzgam Wattoo B New C/o. link road from main road to Jumma Thokerepra via Noorul Islam Public School at Checki Wattoo. 4.000 0.000 1.000 5.000 0.000 4.0000 0.0000 Phy Completed
Total Manzgam 16.69 4.00 8.42 29.11 0.00 16.69 4.59  
1 DHK Marg Dragdan ongoing C/o. Batpora Palpora road  1.445 1.445 0.00 2.890 0.000 1.4450 1.4450 Completed
2 DHK Marg Boh New C/o. Linning wall of Boshi Nallah from Kandimarg to DK Marg Bridge via Boh 4.000 0.000 1.00 5.000 0.000 4.0000 0.0000 Phy Completed
3 DHK Marg Nagam  A New C/o. Fencing around Eidgah Mirpora and fencing around High School Nagam 4.000 0.000 1.00 5.000 0.000 4.0000 0.0000 Under Progress
4 DHK Marg Chimmer B New Construction of road from Dumpora to Naibasti at Chimmer-B DK Marg 3.000 0.000 0.00 3.000 0.000 3.0000 0.0000 Under Progress
Total DK Marg 12.45 1.45 2.00 15.89 0.00 12.45 1.445  
1 Devsar Bonigam New C/o. Fencing of New Eidgah at Bonigam 2.400 0.000 0.60 3.000 0.000 2.4000 0.0000 Under Progress
2 Devsar C Panjan New C/o. FP Bund alongside River Nallah Yethyethru 4.000 0.000 1.00 5.000 0.000 4.0000 0.0000 Phy Completed
3 Devsar Khrewan New C/o. FP Bund on Veshue Nallah at Lassipora 4.000 0.000 1.00 5.000 0.000 4.0000 0.0000 Phy Completed
4 Devsar Bozgam New C/o. drain  at through Village Aagroo 5.600 0.000 1.40 7.000 0.000 5.6000 0.0000 Phy Completed
5 Devsar YH Babapora New C/o Irrigation Ladh from Bonigam to Baihama 4.000 0.000 1.00 5.000 0.000 4.0000 0.0000 Under Progress
Total Devsar 20.00 0.00 5.00 25.00 0.00 20.000 0.00  
1 Behibagh Hanjan New Dev. of link from Hanjan to Shiganpora to Daderkote. 4.000 3.64 2.36 10.000 1.720 2.2800 0.0000 Phy Completed
2 Behibagh Yamrach -A  New Upgradation of link roads at Yamrach 1.200 0.000 0.80 2.000 0.000 1.2000 0.0000 Phy Completed
3 Behibagh Parigam  New C/o fencing of graveyard near Ziyarat Sharief  1.200 0.000 0.80 2.000 0.000 1.2000 0.0000 Phy Completed
4 Behibagh Hangalbush  New C/o tile lanes in Gram Panchayat  1.200 0.000 0.80 2.000 0.000 1.2000 0.0000 Phy Completed
5 Behibagh Daderkoot  New C/o link road at Nadbal Cheki Hanjan, Ganie Mohalla Daderkoot, Sofipora & Cheki Hanjan Wanipora Nowpora  1.200 0.000 0.800 2.000 0.000 1.2000 0.0000 Phy Completed
6 Behibagh Tantraypora  New Upgradation of link roads at various spots, Shahpora Sonikhah Sehpora  1.200 0.000 0.800 2.000 0.000 1.2000 0.0000 Phy Completed
7 Behibagh Yamrach – B New C/o road network to field crop at Yamrach  1.200 0.000 0.800 2.000 0.000 1.2000 0.0000 Under Progress
8 Behibagh Munad Gufan New C/o road from Middle School towards Hatipora Batpora  1.200 0.000 0.800 2.000 0.000 1.2000 0.0000 Phy Completed
9 Behibagh Matibugh  New C/o lin road from main road to Beebrada with edge walls at Matibugh  1.200 0.000 0.800 2.000 0.000 1.2000 1.2000 Phy Completed
10 Behibagh Sempora Derpora  New C/o road from Tungdanoo Masjid Sharief to Munchwa  1.200 0.000 0.800 2.000 0.000 1.2000 0.0000 Phy Completed
11 Behibagh Khee Jogipora  New C/o link road from main road Jogipora to Kumar Mohalla  1.200 0.000 0.800 2.000 0.000 1.2000 0.0000 Phy Completed
12 Behibagh Noonmai New Const. of approach road to SSA School and Marg. 4.000 0.00 1.00 5.000 0.000 4.0000 0.0000 Phy Completed
13 Behibagh Turigam New C/o Link raod Turigam Devbugh to Nanibugh. 3.200 0.00 0.80 4.000 0.000 3.2000 0.0000 Phy Completed
Total Behibagh 23.20 3.64 12.16 39.00 1.72 21.480 1.20  
1 Frisal Badroo New C/o. Link road from Salfia School to Lanchi Wouder at Badroo. 4.000 0.000 1.00 5.000 0.000 4.0000 0.0000 Phy Completed
Total Frisal 4.000 0.000 1.000 5.000 0.000 4.000 0.000  
Grand Total 170.170 24.530 63.150 257.850 3.863 166.31 40.337  

 

2. Public Health Engineering (PHE):

List of works under execution under Back to Village Programme – 2nd Phase
S No Sector/
Agency
Panchayat Halqa Name of the work Estimated Cost Authorised cost Rs in Lacs Funds released under B2V1 during 2019-20 Expdt. 31-03-2020 funds released  under B2V2 during 2020-21 Expdtt during 2020-21 (B2V2) Physical Status
BTV 14th FC MGNREGA Total BTV 14th FC MGNREGA Total
1 PHE Akhall Providing & fixing of chain link fencing around 0.10 Lac gallon collection sump and spring at Akhall WSS Akhall 10.00 10.00 0.000 0.000 10.000 4.36 4.36 0.00 0.00 4.36 5.640   WIP
2 Ashmuji-A L/F of Parrallel line from SR upto Mohalla Mishpora Ashmuji-A 7.00 7.00 0.000 0.000 7.000 5.77 5.77 0.00 0.00 5.77 0.372 0.372 Completed
3 Hallan Providing of drinking water supply to village Hallan 4.00 4.00 0.000 0.000 4.000 2.53 2.53 0.00 0.00 2.53 1.102 1.102 Completed
4 Shirpora Restoration of drinking water supply facilities to Shirpora 9.00 9.00 0.000 0.000 9.000 8.11 8.11 0.00 0.00 8.11 0.000 0.000 Completed
5 Manzgam Upgradation of RS at Manzgam B 1.76 1.50 0.000 0.000 1.500 1.28 1.28 0.00 0.00 1.28 0.000 0.000 Completed
6 Bangward Construction of 0.12 lac gallon capacity SR for village Bangward 4.33 3.78 0.000 0.000 3.780 3.78 0.00 0.00 0.00 0.00 3.750 3.750 Completed
7 Tangmarg-A Laying/fitting of 40mm dia supply line Rather Mohalla Tangmarg 1.00 1.00 0.000 0.000 1.000 0.65 0.65 0.00 0.00 0.65 0.300 0.300 Completed
  Total PHE  37.09 36.28 0.00 0.00 36.28 26.48 22.70 0.00 0.00 22.70 11.16 5.524  

 

3. Irrigation:

List of works under execution under Back to Village Programme – 2nd Phase
S No Sector/
Agency
Block Panchayat Halqa Name of the work Estimated Cost Authorised cost Rs in Lacs Funds released under B2V1 during 2019-20 Expdt. 31-03-2020 funds released  under B2V2 during 2020-21 Expdtt during 2020-21 (B2V2) Physical Status
BTV 14th FC MGNREGA Total BTV 14th FC MGNREGA Total
1 Irrigation Qaimoh Rampora Restoration of damaged escape channel of Durbal Ladi ( B/o Mav Khul)  at  Hawoora.  2.00 2.00 0.000 0.000 2.000 0.80 0.80 0.00 0.00 0.80 1.200 1.200 Completed
2 Behibagh Behibagh Construction of cement concrete channel near the delivery tank of Behibagh LIS at village Behibagh spot 2nd. 4.50 4.5 0.000 0.000 4.500 0.00 0.00 0.00 0.00 0.00 2.980 2.980 Completed
3 Behibagh Katapora Construction of lining wall on both sides of Katapora Minor from Khanpor Check to Zainpora canal at places. 4.90 4.90 0.000 0.000 4.900 0.00 0.00 0.00 0.00 0.00 3.266 3.266 Completed
4 Kulgam   Construction of Tractor Crossing /foot bridge at RD 10150 Mtr on Mav Kull at village Poniwah 11.976 11.976 0.000 0.000 11.976 0.00 0.00 0.00 0.00 0.00 8.840 0.000 Under Process
5     C/o Irrigation Canal from Goniwan to Konchipora by way of Construction of R/Wall and bed treatment 3.154 3.154 0.000 0.000 3.154 0.00 0.00 0.00 0.00 0.00 2.510 0.000 Under Process
    Total Irrigation 23.38 23.38 0.00 0.00 23.38 0.80 0.80 0.00 0.00 0.80 18.80 7.45  

 

4. Flood Control:

List of works under execution under Back to Village Programme – 2nd Phase
S No Sector/
Agency
Block Panchayat Halqa Name of the work Estimated Cost Authorised cost Rs in Lacs Funds released under B2V1 during 2019-20 Expdt. 31-03-2020 funds released  under B2V2 during 2020-21 Expdtt during 2020-21 (B2V2) Physical Status
BTV 14th FC MGNREGA Total BTV 14th FC MGNREGA Total
75 Flood Control Block Cluster of Panchayats Construction of Protection bund from Nihama bridge to Water Tank Nihama (RD 10600-10890 Mtrs)with spurs 17.027 17.027 0.000 0.000 17.027 0.00 0.00 0.00 0.00 0.00 17.027 17.027 Completed
    Cluster of Panchayats Construction of FP Bund on L/S of Veshow Nallah at Naid Pora Chadder 11.973 11.973 0.000 0.000 11.973 0.00 0.00 0.00 0.00 0.00 11.973 0.000  
      Total Flood Control 29.00 29.00 0.00 0.00 29.00 0.00 0.00 0.00 0.00 0.00 29.00 17.03  

 

5. PDD:

List of works under execution under Back to Village Programme – 2nd Phase
S No Sector/
Agency
Block Name of the work Estimated Cost Authorised cost Rs in Lacs Funds released under B2V1 during 2019-20 Expdt. 31-03-2020 Funds released  under B2V2 during 2020-21 Expdtt during 2020-21 (B2V2)
BTV 14th FC MGNREGA Total BTV 14th FC MGNREGA Total
1 PDD Kulgam Providing of 63KV transformers for meeting out B2V demands  5.00 5.000 0.000 0.000 5.000 5.000 0.00 0.00 0.00 0.00 5.00 0.00
2 PDD Pombay Construction of 63KVA Substation at Bonpora Naibasti Nehama 2.65 0.000 0.000 0.000 2.650 0.000 0.00 0.00 0.00 0.00 2.65 0.00
3 PDD Kulgam Construction of 100 KVA Substation at Bomrath Mohalla new Basti 4.80 0.000 0.000 0.000 4.800 0.000 0.00 0.00 0.00 0.00 4.80 0.00
4 PDD Devsar HT/LT improvement at village Chandian Panjan NHO Sabzar Ahmad Malik 2.50 0.000 0.000 0.000 2.500 0.000 0.00 0.00 0.00 0.00 2.50 0.00
5 PDD Behibagh Creation of 63 KVA Substation at Naid Hanjan 3.00 0.000 0.000 0.000 3.000 0.000 0.00 0.00 0.00 0.00 3.00 0.00
6 PDD   Construction of 63KVA Substation at Arreh Bangladash New Colony 3.00 0.000 0.000 0.000 3.000 0.000 0.00 0.00 0.00 0.00 3.00 0.00
7 PDD   Creation of 100 KVA Substation alongwith HT line at Bonpora Badroo 3.78 0.000 0.000 0.000 3.780 0.000 0.00 0.00 0.00 0.00 3.78 0.00
    Total PDD 24.73 5.00 0.00 0.00 24.73 5.00 0.00 0.00 0.00 0.00 24.73 0.00