ACTION PLAN /DEMANDS UNDER B2V3 (PH-1ST) OF DISTRICT KULGAM FOR THE YEAR 2020-21 |
SNO |
BLOCK |
PANCHAYAT |
NAME OF THE DEMAND |
DEPARTMENT |
PRIORITY |
ESTT. COST (APROX). |
1 |
Manzgam |
Tangmarg A |
C/O ROAD FROM GOVT HIGH SCHOOL TO PADSHAHADDA 3.5 KM |
RDD |
1 |
9.80 |
SUB TOTAL |
|
|
9.80 |
2 |
Manzgam |
Tangmarg B |
C/O ROAD FROM GURWATAN TO SANGAM ROAD |
RDD |
6 |
9.80 |
SUB TOTAL |
|
|
9.80 |
3 |
Manzgam |
Wattoo A |
FOOT PATH FROM H/O AB QAYOOM TO H/O GH HASSAN KHAN BY THE SIDE ORCHARDS OF SONULLAH THOKER TO SHARIEF AHMAD NAIK , SHAMEEM AHMAD , ALI MOHD NAIK AND OTHERS |
RDD |
4 |
6.00 |
SUB TOTAL |
|
|
6.00 |
4 |
Manzgam |
MANZGAM-A |
FENCING OF EIDGAH AND NOOR ABAD CANAL |
RDD |
4 |
9.80 |
SUB TOTAL |
|
|
9.80 |
5 |
Manzgam |
Asnoor |
UPGRADATION AND C/O GAMKULL NOORABAD CANAL TO LAMINMARG |
RDD |
7 |
9.80 |
SUB TOTAL |
|
|
9.80 |
6 |
DH Pora |
Laisoo |
C/O BUND ALONG BANKS OF RIVER VESHOW |
RDD |
1 |
9.74 |
SUB TOTAL |
|
|
9.74 |
7 |
DH Pora |
Khull-B |
FLOOD PROTECTION BUND ON NALLAH KANDI FROM PLAY FIELD TO MAZAR LACHI |
RDD |
1 |
9.80 |
SUB TOTAL |
|
|
9.80 |
8 |
DH Pora |
Yarikha-B |
C/O LINK ROAD KHARPORA TO LOWLOO ROAD AND LANGKHULL TO DADREN |
RDD |
5 |
9.66 |
SUB TOTAL |
|
|
9.66 |
9 |
DH Pora |
Yarikha-C |
C/O CRATE PROTECTION BUND TO NALLA FROM DAINIPORA TO JOGARPORA MARGIBAL |
RDD |
2 |
8.20 |
SUB TOTAL |
|
|
8.20 |
10 |
DH Pora |
Khull-A |
C/O ROAD FROM KHARDAM TO ORCHARD OF SHARIEF MAGREY |
RDD |
2 |
9.80 |
SUB TOTAL |
|
|
9.80 |
11 |
DH Pora |
Waripora |
FENCING OF GRAVE YARD AT WARIPORA |
RDD |
5 |
9.80 |
SUB TOTAL |
|
|
9.80 |
12 |
DH Pora |
D.H.Pora-B |
C/O PLAY FIELD AT DH PORA -B |
RDD |
6 |
3.00 |
13 |
DH Pora |
D.H.Pora-B |
C/O ROAD FROM M/ROAD TO BODINARD |
RDD |
7 |
6.80 |
SUB TOTAL |
|
|
9.80 |
14 |
DH Pora |
Nandimarag-A |
EXTENSION OF ALREADY CONSTRUCTED YARIKHAH LANGKHULL DOBIDOBAN ROAD TO PARIMPORA |
RDD |
2 |
9.291 |
SUB TOTAL |
|
|
9.291 |
15 |
DH Pora |
C.R.Pora |
C/O FP BUND MAHAMDIYA COLONY TO RAJPORA AT CHACK NALLAH |
RDD |
1 |
9.80 |
SUB TOTAL |
|
|
9.80 |
16 |
DH Pora |
Kounsarbal |
C/O ROAD FROM KOUNSERBAL TO PAZIPORA BALA |
RDD |
4 |
9.48 |
SUB TOTAL |
|
|
9.48 |
17 |
POMBAY |
MIRHAMA |
C/O CULVERT AT KHARNARD AT MUDERGAM |
RDD |
2 |
9.80 |
SUB TOTAL |
|
|
9.80 |
18 |
POMBAY |
PARIWAN |
C/O ROAD FROM GARDIHAMA TO SAMNOO ROAD |
RDD |
4 |
9.80 |
SUB TOTAL |
|
|
9.80 |
19 |
POMBAY |
POMBAY |
ROAD FROM CHERDOOR TO DABERSHOUTH WITH L WALL AND DRAIN |
RDD |
2 |
5.00 |
20 |
POMBAY |
POMBAY |
ROAD FROM POMBAY TO TAKIA VILLAGE VIA PANCHAYAT |
RDD |
3 |
4.80 |
SUB TOTAL |
|
|
9.80 |
21 |
POMBAY |
UDOORA |
LINK ROAD UDOORA TO AHWATOO |
RDD |
5 |
9.80 |
SUB TOTAL |
|
|
9.80 |
22 |
Behibagh |
Noonmai |
C/O OF BRIDGE AT DASSEND NARD |
RDD |
3 |
3.45 |
23 |
Behibagh |
Noonmai |
FENCING OF PANDITHPORA GRAVEYARD. |
RDD |
5 |
5.80 |
SUB TOTAL |
|
|
9.25 |
24 |
Behibagh |
Desend |
DEVELOPMENT OF GAM KULL NEAR PANDITH LAND AT ZABAN. |
RDD |
1 |
4.90 |
25 |
Behibagh |
Desend |
DEVELOPMENT OF LINK ROAD FROM PALNOO TO DESSEND |
RDD |
3 |
4.86 |
SUB TOTAL |
|
|
9.76 |
26 |
BEHIBAGH |
KATAPORA |
C/O OF DRAIN FRPM ABASS MIR TO ONWARDS VIA H/O AB GAFFAR MIR LATAPORA |
RDD |
2 |
3.17 |
27 |
BEHIBAGH |
KATAPORA |
C/O AND UPGRADATION OF BUD NAG (DRINKING WATER SOURCE) |
RDD |
3 |
6.57 |
SUB TOTAL |
|
|
9.74 |
28 |
BEHIBAGH |
TURIGAM |
C/O BUND GRUM TO KANNAL RIVVER |
RDD |
1 |
9.80 |
SUB TOTAL |
|
|
9.80 |
29 |
BEHIBAGH |
BEHIBAGH |
BEHIBAGH TUNDANOO ROAD, BEHIBAGH HANJAN ROAD |
RDD |
3 |
9.80 |
SUB TOTAL |
|
|
9.80 |
30 |
BEHIBAGH |
MUNNAD GUFFAN |
FENCING OF 02 NO GRAVEYARD FOR MUNNAD GUFFAN |
RDD |
3 |
5.50 |
31 |
BEHIBAGH |
MUNNAD GUFFAN |
LINNING / BUND ON TUNGRI NALLAH FROM MUNNAD TO KHUGPORA |
RDD |
4 |
4.30 |
SUB TOTAL |
|
|
9.80 |
32 |
BEHIBAGH |
YEMRECH-B |
LINK ROAD TO GRAT MOHALLA AND RAJ MOHALLA |
RDD |
4 |
1.74 |
SUB TOTAL |
|
|
1.74 |
33 |
BEHIBAGH |
PARIGAM |
GRAT LADH TO BE CONSTRUCTED |
RDD |
3 |
3.18 |
SUB TOTAL |
|
|
3.18 |
34 |
BEHIBAGH |
TANTRAYPORA |
TILE LANE FROM JAMIA MASJID SURSUNA TO HOUSE OF M KAMAL WAGAY |
RDD |
2 |
5.10 |
SUB TOTAL |
|
|
5.10 |
35 |
FRISAL |
NOWBAL |
PROTECTION BUND FOR MOHALLA TENGPORA CHANPORA |
RDD |
6 |
7.72 |
SUB TOTAL |
|
|
7.72 |
36 |
FRISAL |
KALADRANG |
C/O LINK ROAD FROM KALADRANG TO KALIPORA |
RDD |
4 |
9.80 |
SUB TOTAL |
|
|
9.80 |
37 |
FRISAL |
SHERPORA |
LINK ROAD FROM SHERPORA TO CHINGAM (PHASE II) |
RDD |
1 |
2.17 |
38 |
FRISAL |
SHERPORA |
LINK ROAD FROM FRISAL WUDER TO BATBAGH GUNDCHIHAL (CANAL ROAD) |
RDD |
3 |
7.63 |
SUB TOTAL |
|
|
9.80 |
39 |
QAIMOH |
REHPORA |
DESILITTING AND LINING WALL OF DUBJI CANAL |
RDD |
1 |
9.80 |
SUB TOTAL |
|
|
9.80 |
40 |
QAIMOH |
KHUDWANI |
CONST. OF IRRIGATION /FLOOD PROTECTION BUND AT SHALIMAR FROM MUSHTAQ AHMAD TO TARIQ SHAH AT REHPORA |
RDD |
2 |
9.80 |
SUB TOTAL |
|
|
9.80 |
41 |
QAIMOH |
RAMPORA |
XING AT KOONDAL ROAD NEAR THE LAND OF M MAQBOOL LONE AT HAWOORAH |
RDD |
3 |
6.99 |
42 |
QAIMOH |
RAMPORA |
LINK ROAD FROM RAMPORA TO BUCHROO |
RDD |
7 |
2.81 |
SUB TOTAL |
|
|
9.80 |
43 |
QAIMOH |
WANIGUND |
DRAIN FROM GRAVEYARD GHAT TO BONGHAT AT QAIMOH FRISAL ROAD |
RDD |
2 |
7.66 |
44 |
QAIMOH |
WANIGUND |
FP BUND OVER NALLAH GREE |
RDD |
3 |
1.90 |
SUB TOTAL |
|
|
9.56 |
45 |
QAIMOH |
BOGUND |
CHAINLINK FENCING OF 3 NO GRAVEYARDS VIZ KRALPORA BIBTENG SHOGUND AND ZIYARAT SHARIF |
RDD |
1 |
9.80 |
SUB TOTAL |
|
|
9.80 |
46 |
QAIMOH |
KAWAKI BAZAR |
PROPER DRAINAGE SYSTEM FOR PANCHAYAT HALQA |
RDD |
1 |
2.00 |
SUB TOTAL |
|
|
2.00 |
47 |
QAIMOH |
SRANDOO |
RENOVATION OF SPRINGS ESPECIALLY NEAR JAMAI MASJID SRUNDOO AND MASJID SHARIF KULPORA |
RDD |
2 |
1.92 |
SUB TOTAL |
|
|
1.92 |
48 |
QAIMOH |
BHAN |
C/O LINK ROAD FROM TNPORA TO CHECK AT BHAN |
RDD |
3 |
9.41 |
SUB TOTAL |
|
|
9.41 |
49 |
QAIMOH |
WANPORA |
FP BUND FROM BAT TACHLOO TO WANPORA |
RDD |
4 |
9.80 |
SUB TOTAL |
|
|
9.80 |
50 |
QAIMOH |
MATALHAMA |
FP BUND AT NALLAH VISHUW MATALHAMA |
RDD |
3 |
9.80 |
SUB TOTAL |
|
|
9.80 |
51 |
Qaimoh |
Redwani Payeen |
RAISING/FENCING OF GRAVEYARD & FUNERAL GROUND NEAR OVERHEAD WATER TANKY. |
RDD |
4 |
9.80 |
SUB TOTAL |
|
|
9.80 |
52 |
Qaimoh |
Thokerpora |
GUFBAL GRAVEYARD CHAIN LINK FENCING (PARTIAL) |
RDD |
3 |
9.72 |
SUB TOTAL |
|
|
9.72 |
53 |
Pahloo |
Lammer B |
C/O PROTECTION WALL FROM BACK SIDE OF GPS KOTRAN BOUTH, PS HAPATWARD |
RDD |
3 |
9.80 |
SUB TOTAL |
|
|
9.80 |
54 |
Pahloo |
Malwan B |
CONSTT. OF ROAD FROM RANGWARD TO GUJJAR BASTI PHASE II |
RDD |
4 |
9.80 |
SUB TOTAL |
|
|
9.80 |
55 |
DEVSAR |
AKHRAN |
FELLING OF TREES IN THE COMPOUND AND FENCING ALONG NALLAH AT GMS KATRAN |
RDD |
2 |
2.05 |
56 |
DEVSAR |
AKHRAN |
C/O FLOOD PROTECTION BUND ON NALLAH VETHVETHROO AT BONGAMUD NOWGAM |
RDD |
5 |
6.95 |
SUB TOTAL |
|
|
9.00 |
57 |
DEVSAR |
BANGHALL |
C/O TILE LANE FOR GUJAR BASTI BANGHAL |
RDD |
1 |
7.80 |
SUB TOTAL |
|
|
7.80 |
58 |
DEVSAR |
BERIGAM |
C/O PROTECTION BUND NALLAH YATHYATHROO AT BERIGAM PHASE 1,2,3 & 4 |
RDD |
6 |
8.90 |
SUB TOTAL |
|
|
8.90 |
59 |
DEVSAR |
BONIGAM |
C/O OF DRAIN OPPOSITE NATIONAL HIGHWAY NEAR H/O JAVAID BHAT ,MOHD AMIN BHAT |
RDD |
23 |
5.37 |
SUB TOTAL |
|
|
5.37 |
60 |
DEVSAR |
CHOWGAM A |
APPROACH ROAD TO PRATABPORA |
RDD |
2 |
5.34 |
61 |
DEVSAR |
CHOWGAM A |
C/O FLOOD PROTECTION BUND ON RIVER LAMMRI |
RDD |
1 |
4.46 |
SUB TOTAL |
|
|
9.80 |
62 |
DEVSAR |
CHURAT |
DEVELOPMENT OF INTERIOR LANES AT CHURAT AND CHECK CHURAT |
RDD |
1 |
9.80 |
SUB TOTAL |
|
|
9.80 |
63 |
DEVSAR |
CHECKI BADWANI |
TILE LANES AT ALL WARDS C BADWANI |
RDD |
15 |
8.12 |
SUB TOTAL |
|
|
8.12 |
64 |
DEVSAR |
DEVSAR |
C/O OF ROAD FROM MAIN ROAD TO MASKHUD |
RDD |
4 |
8.60 |
SUB TOTAL |
|
|
8.60 |
65 |
DEVSAR |
G T PORA |
C/O FLOOD PROTECTION/RCC WALL ON LEFT SIDE OF VESHAW NALLAH FROM ZANGALPORA TO NOWPORA |
RDD |
1 |
9.00 |
SUB TOTAL |
|
|
9.00 |
66 |
DEVSAR |
HABLISH |
C/O LINK ROAD FROM MAIN ROAD TO MIDDLE SCHOOL ZAIPORA |
RDD |
4 |
9.80 |
SUB TOTAL |
|
|
9.80 |
67 |
DEVSAR |
KILAM B |
C/O PASSANGER SHED AT MAIN MARKET KILAM |
RDD |
2 |
2.00 |
SUB TOTAL |
|
|
2.00 |
68 |
DEVSAR |
MANIGAM |
C/O ROAD ALONG THE EMBANKMENTS OF VETVETHROO FROM NAIDTAR BRIDGE TO KACHDOORA VIA BON MANIGAM |
RDD |
3 |
9.00 |
SUB TOTAL |
|
|
9.00 |
69 |
DEVSAR |
MANDHOLE |
2 NO. CROSSING NEAR MS MANDOLE & ZRADIPORA |
RDD |
5 |
9.50 |
SUB TOTAL |
|
|
9.50 |
70 |
DK MARG |
BADIJAHLAN |
CONSTRUCTION OF A PROTECTION BUND AT JAMIA MASJID BADIJAHLAN |
RDD |
5 |
9.76 |
SUB TOTAL |
|
|
9.76 |
71 |
DK MARG |
D.K.MARG A |
ROAD FROM M/ROAD TO WADERNARD |
RDD |
3 |
9.80 |
SUB TOTAL |
|
|
9.80 |
72 |
DK MARG |
D.K.MARG C |
DEVELOPMENT OF ROADS CONNECTING THE WHOLE PANCHAYAT TO THE MAIN ROAD DANOW |
RDD |
3 |
8.78 |
SUB TOTAL |
|
|
8.78 |
73 |
DK MARG |
GULZARABAD |
FOOTSTEPS AT GULZARABAD GUJARBASTI |
RDD |
2 |
9.35 |
SUB TOTAL |
|
|
9.35 |
74 |
DK MARG |
DRAGDEN |
CONNECTIVITY OF NANDIMARG SIALKHANJAM ROAD |
RDD |
4 |
7.66 |
SUB TOTAL |
|
|
7.66 |
75 |
DK MARG |
NAGAM 2A |
FENCING AROUND EIDGAH & MIRPORA GRAVEYARD OPPOSITE SHEEP FARM |
RDD |
3 |
7.08 |
SUB TOTAL |
|
|
7.08 |
76 |
KULGAM |
Katrasoo |
C/O MAINTANCE & SANITATION OF THE SPRING NEAR MASJID SHREEF . |
RDD |
1 |
1.07 |
77 |
KULGAM |
Katrasoo |
C/O FENCING OF GRAVEYARD PH-III. |
RDD |
2 |
2.27 |
78 |
KULGAM |
Katrasoo |
C/O ROAD FROM M/ROAD TO NALLAH SUNMAN AT MATIPORA KATRASOO. |
RDD |
7 |
3.76 |
SUB TOTAL |
|
|
7.10 |
79 |
KULGAM |
Lirrow |
PLAY GROUND AT LIRROW |
RDD |
2 |
8.70 |
SUB TOTAL |
|
|
8.70 |
80 |
KULGAM |
Chehllan |
F/P BUND AT VISHOW NALLAH CHEHLLAN |
RDD |
1 |
9.80 |
SUB TOTAL |
|
|
9.80 |
81 |
Kund |
Waltengoo-A |
RENOVATION/BEAUTIFICATION OF ZIYARAT SHAREEF |
RDD |
5 |
9.80 |
SUB TOTAL |
|
|
9.80 |
82 |
Kund |
KRALOO |
PROTECTION BUND FROM T-DAR TO HAPITNAGIN |
RDD |
1 |
9.80 |
SUB TOTAL |
|
|
9.80 |
83 |
Manzgam |
HALLEN |
INTERNAL LINK ROADS CONNECTIVITY (MAIN ROAD TO LAWAY MOHALLA |
RDD |
4 |
6.82 |
SUB TOTAL |
|
|
6.82 |
84 |
Manzgam |
Wattoo A |
REPAIRMENT OF INTERNAL LINK ROADS OF WATTOO (C/O DRAIN ALONG ROAD SIDES OF HERGAM BYWAY ROAD AT WATOO – A) |
RDD |
6 |
3.8 |
SUB TOTAL |
|
|
3.8 |
85 |
Manzgam |
AVIL |
INRERNAL ROADS OF PYT HALQA UPGRADATION (ROAD FROM H/O FAYAZ MOLVI TO MANZOOR NAJAR , IQBAL MIR TO RAZAK BHAT ) |
RDD |
4 |
7.32 |
SUB TOTAL |
|
|
7.32 |
86 |
DH Pora |
Ahmadbabad-B |
UPGRADATION OF ALL INTERNAL LINK ROADS (JAMIA MASJID TO HASSAN LAWAY , MIDLE SHOP TO GRAT KHULL , HABIB MALIK TO JAMIA MASJID AND JAMIA MASJID TO B. A LAWAY ) |
RDD |
4 |
9.8 |
SUB TOTAL |
|
|
9.8 |
87 |
Behibagh |
Manchwa |
C/O INTERIOR ROAD.( FROM MAIN ROAD MAIN ROAD VIA MASJID SHARIEF TO H/O AHMADULLAH BHAT WITH BRANCHS AT MANCHEWA ) |
RDD |
1 |
8.46 |
SUB TOTAL |
|
|
8.46 |
88 |
BEHIBAGH |
YEMRECH -A |
UPGRADATION OF LINK ROADS (FROM MAIN ROAD TO H/O AB SALAM VIA MASJID BILAL AND YAMRACH TUNGDANOO LINK ROADS WITH BRANCHS AT YAMRACH -A ) |
RDD |
8 |
9.8 |
SUB TOTAL |
|
|
9.8 |
89 |
BEHIBAGH |
YEMRECH-B |
DRAINAGE SYSTEM (FROM BABA SHIEKH MOHALLA TO NADCHE ADDA WITH DIFFERENT BRANCHS AT KHANPORA YAMRACH-B) |
RDD |
3 |
8.06 |
SUB TOTAL |
|
|
8.06 |
90 |
BEHIBAGH |
PARIGAM |
03 NO IRRIGATION LADH AT SANMAN (NEAR PANCHAYAT GHAR PARIGAM PAYEEN) |
RDD |
1 |
6.62 |
SUB TOTAL |
|
|
6.62 |
91 |
BEHIBAGH |
DEDRKOOT |
PROTECTION OF VARIOUS LADHS (DEVELOPMENT NOOMAI LADH FROM L/O SARTAJ AHMAD SHAH TOWARDS NAZIR AHMAD BHAT AT SOFIPORA ) |
RDD |
6 |
9.8 |
SUB TOTAL |
|
|
9.8 |
92 |
QAIMOH |
KAWAKI BAZAR |
FLOOD PROTECTION BUND (NEAR H/O GH MOHD MALLA TO ONWARDS ON NALLAH GREY) |
RDD |
3 |
7.8 |
SUB TOTAL |
|
|
7.8 |
93 |
Pahloo |
Lammer A |
DEVELOPMENT AND UPGRADATION OF ROADS IN PANCHAYAT HALQA (C/O NAGAR ROAD FROM MAIN ROAD TOWARDS BOONIBOTH AT LAMMER -A) |
RDD |
2 |
9.8 |
SUB TOTAL |
|
|
9.8 |
94 |
DEVSAR |
CHOWGAM B |
C/O BUNDS ON NALLA (AT CHOGAM NEAR HOSIPITAL DOWNRADS ON NALLAH LAMDI ) |
RDD |
6 |
8.98 |
SUB TOTAL |
|
|
8.98 |
95 |
DEVSAR |
SOPAT |
C/O DRAIN AND ROAD AT SOPAT (FROM ZIYARAT SHARIEF BABA DAWOOD KHAKI KUMAR TO ONWARDS) |
RDD |
5 |
6.4 |
SUB TOTAL |
|
|
6.4 |
96 |
DK MARG |
CHIMMER B |
LINK ROAD CONNECTIVITY (FROM MAIN ROAD TO GURIWAN) |
RDD |
5 |
9.4 |
SUB TOTAL |
|
|
9.4 |
97 |
DK MARG |
NAGAM 1A |
UPGRADITION OF INTERLINK ROAD (ROAD FROM MAIN ROAD TO CHECKI NAGAM VIA BANGDAR , ROAD FROM MAIN ROAD TO GH MOHD LONE TO ARDPORA ) |
RDD |
3 |
9.68 |
SUB TOTAL |
|
|
9.68 |
98 |
KULGAM |
Katrasoo |
C/O LANES /DRAINS AT KATRASOO AT(FROM MAIN ROAD TO SUNMAN MATIPORA, C/O LANE /DRIAN MAIN ROAD TO GRAVEYARD MATIPORA) |
RDD |
6 |
2.7 |
SUB TOTAL |
|
|
2.7 |
99 |
KULGAM |
Mohipora |
CONSTRUCTION OF TILE LANES IN AND AROUND VILLAGE BUMBRATH.(C/O LANE AZIZ MIR TO LINE MASJID SHARIEF 700 FT TANZANYIA MIR TO ZIZYARAT SHARIEF 700 FT , ZIYARAT SHARIEF TO FAROOQ MIR AND OTHERS 600 FT ) |
RDD |
5 |
6.12 |
GRAND TOTAL |
|
|
862.39 |